Difference between revisions of "Hall Anarchy"
(→Budget) |
|||
Line 5: | Line 5: | ||
===Party=== | ===Party=== | ||
− | The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous [[πnis]]. | + | Fall 2007: The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous [[πnis]]. |
+ | |||
+ | Spring 2008: ??? | ||
===FAC=== | ===FAC=== | ||
Line 12: | Line 14: | ||
===Budget=== | ===Budget=== | ||
− | + | ||
+ | When applicable, email out exact specs of item a few days before actual purchase. Try to buy things that you can by March. | ||
+ | |||
{| border="1" | {| border="1" | ||
|- | |- | ||
! Item !! Sponsor !! Total $ !! $ Spent | ! Item !! Sponsor !! Total $ !! $ Spent | ||
|- | |- | ||
− | | Hall Feeds || floorpi-chairs || | + | | Hall Feeds || floorpi-chairs || 180 || to be scheduled |
|- | |- | ||
− | | | + | | Finals Dinners || floorpi-chairs || 200 || end of term |
|- | |- | ||
− | | | + | | New Athena || Michael/Adam || 250 || 0 |
|- | |- | ||
− | | | + | | Party || PartyComm || 200 || tba |
|- | |- | ||
− | | Party || PartyComm || | + | | Party Gadgets || PartyComm || 50 || tba |
|- | |- | ||
− | | Hall | + | | Hall Parties || PartyComm || 150 || tba |
|- | |- | ||
− | | | + | | Hall Paint || floorpi-chairs || 50 || 0 |
|- | |- | ||
− | | | + | | [[GameComm|Game Comm]] || Michael || 50 || 0 |
|- | |- | ||
− | | | + | | Flour, Sugar, Rice, etc. || floorpi-chairs || 50 || 0 |
|- | |- | ||
− | | | + | | Baking sheets, pots, pans, etc. || Angela & Rachel || 100 || soon |
|- | |- | ||
− | | | + | | Slush || floorpi-chairs || 150 || 0 |
|- | |- | ||
− | | | + | | Rush || rush chairs (tbd) || 300 (cap) || Aug 2008 |
|- | |- | ||
− | | | + | | Bob || floorpi-chairs || 200 || 0 |
|- | |- | ||
− | | | + | | Switches || Adam || 60 || 0 |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
|- | |- | ||
|} | |} | ||
− | + | ==Mural Policy== | |
+ | |||
+ | A proposal should be emailed to the hall (& posted on location if possible) with | ||
+ | a basic design and location. Important factors: background color, general | ||
+ | content, size, etc. | ||
+ | |||
+ | Painting can start after 12 hours after that objections can be raised for | ||
+ | another 2 days (60 hours after original proposal). If changes are made to the | ||
+ | design/proposal all times restart, meaning: another 12 hours until painting and | ||
+ | then 2 more for objections. | ||
+ | |||
+ | Threshold for objections is 10% (meaning essentially always 4 people). You | ||
+ | should include some reason for your objection. Then if proposer can make | ||
+ | changes and as stated above times restart. | ||
+ | |||
+ | If painting has started and then objections occur (to previously mentioned | ||
+ | thresholds), then the painter has one week to paint it a solid neutral color | ||
+ | (ex: white, off white, institute white, light colors...) |
Revision as of 23:57, 10 February 2008
Important Hall Administration Stuff
Party
Fall 2007: The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous πnis.
Spring 2008: ???
FAC
The FAC was this Friday (10/19/07). The theme was Liquid Crack.
Budget
When applicable, email out exact specs of item a few days before actual purchase. Try to buy things that you can by March.
Item | Sponsor | Total $ | $ Spent |
---|---|---|---|
Hall Feeds | floorpi-chairs | 180 | to be scheduled |
Finals Dinners | floorpi-chairs | 200 | end of term |
New Athena | Michael/Adam | 250 | 0 |
Party | PartyComm | 200 | tba |
Party Gadgets | PartyComm | 50 | tba |
Hall Parties | PartyComm | 150 | tba |
Hall Paint | floorpi-chairs | 50 | 0 |
Game Comm | Michael | 50 | 0 |
Flour, Sugar, Rice, etc. | floorpi-chairs | 50 | 0 |
Baking sheets, pots, pans, etc. | Angela & Rachel | 100 | soon |
Slush | floorpi-chairs | 150 | 0 |
Rush | rush chairs (tbd) | 300 (cap) | Aug 2008 |
Bob | floorpi-chairs | 200 | 0 |
Switches | Adam | 60 | 0 |
Mural Policy
A proposal should be emailed to the hall (& posted on location if possible) with a basic design and location. Important factors: background color, general content, size, etc.
Painting can start after 12 hours after that objections can be raised for another 2 days (60 hours after original proposal). If changes are made to the design/proposal all times restart, meaning: another 12 hours until painting and then 2 more for objections.
Threshold for objections is 10% (meaning essentially always 4 people). You should include some reason for your objection. Then if proposer can make changes and as stated above times restart.
If painting has started and then objections occur (to previously mentioned thresholds), then the painter has one week to paint it a solid neutral color (ex: white, off white, institute white, light colors...)