Difference between revisions of "Hall Anarchy"

From Floor Pi Wiki
Jump to: navigation, search
Line 57: Line 57:
 
|}
 
|}
  
 +
===Past budgets===
 +
*[https://thirdwest.scripts.mit.edu:444/wiki/index.php?title=Hall_Admin_Stuffs&oldid=1414 Spring 2008]
 +
*[https://thirdwest.scripts.mit.edu:444/wiki/index.php?title=Hall_Admin_Stuffs&oldid=1309 Fall 2007]
 
==Mural Policy==
 
==Mural Policy==
  

Revision as of 15:19, 30 November 2008

Important Hall Administration Stuff

Party

Fall 2007: The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous πnis.

Spring 2008: Ostcampus Uberfest

Fall 2008: The Great Depression

FAC

Fall 2007: The FAC was 10/19/07. The theme was Liquid Crack.

Spring 2008: The FAC was 2/29/08. Tacos from Taco Bell.

Fall 2008: Phallic FAC. Cucumbers, pickles, bananas, biscotti, popsicles, slim jims, granola bars.

Budget

When applicable, email out exact specs of item a few days before actual purchase. Try to buy things that you can by October. Budget proposal totals to $2,150.

Item Sponsor Total $ $ Spent When
Hall Feeds floorpi-chairs 150 ~95 as announced
Finals Meals floorpi-chairs 200 0 end of term
Music System Michael 150 0
EC Party Rachel 200 0 10-4
Kitchen Supplies Rachel 20 0
Game Comm GameComm 100 102
Spices Rachel 30 0
Baking (flour, sugar) Rachel 30 0
Wiiop Buyout Mario 250 0
Vacuum Maintenance Manal? 30 0
Hall Social floorpi-chairs 290 0
Projector Sho 500 513
Slush floorpi-chairs 200 0

Past budgets

Mural Policy

A proposal should be emailed to the hall (& posted on location if possible) with a basic design and location. Important factors: background color, general content, size, etc.

Painting can start after 12 hours after that objections can be raised for another 2 days (60 hours after original proposal). If changes are made to the design/proposal all times restart, meaning: another 12 hours until painting and then 2 more for objections.

Threshold for objections is 10% (meaning essentially always 4 people). You should include some reason for your objection. Then if proposer can make changes and as stated above times restart.

If painting has started and then objections occur (to previously mentioned thresholds), then the painter has one week to paint it a solid neutral color (ex: white, off white, institute white, light colors...)