Difference between revisions of "Hall Anarchy"

From Floor Pi Wiki
Jump to: navigation, search
(Budget)
Line 5: Line 5:
 
===Party===
 
===Party===
  
The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous [[πnis]].
+
Fall 2007: The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous [[πnis]].
 +
 
 +
Spring 2008: ???
  
 
===FAC===
 
===FAC===
Line 12: Line 14:
  
 
===Budget===
 
===Budget===
====**Budget Meeting Sunday, Feb 10 @ 9pm! Submit your proposals to floorpi-chairs by Saturday midnight!**====
+
 
 +
When applicable, email out exact specs of item a few days before actual purchase. Try to buy things that you can by March.
 +
 
 
{| border="1"
 
{| border="1"
 
|-
 
|-
 
! Item !! Sponsor !! Total $ !! $ Spent   
 
! Item !! Sponsor !! Total $ !! $ Spent   
 
|-
 
|-
| Hall Feeds || floorpi-chairs || 300 || 20+40+?+?+?
+
| Hall Feeds || floorpi-chairs || 180 || to be scheduled
 
|-
 
|-
| Roomba || Mario || 230 || 230
+
| Finals Dinners || floorpi-chairs || 200 || end of term
 
|-
 
|-
| Finals Dinners || floorpi-chairs || 200 || soon
+
| New Athena || Michael/Adam || 250 || 0
 
|-
 
|-
| New Athena || Michael || 200 || 0
+
| Party || PartyComm || 200 || tba
 
|-
 
|-
| Party || PartyComm || 175 || 175
+
| Party Gadgets || PartyComm || 50 || tba
 
|-
 
|-
| Hall Picture || floorpi-chairs || 150 || 150?
+
| Hall Parties || PartyComm || 150 || tba
 
|-
 
|-
| Murder Mystery Dinner || Annie || 100 || 110
+
| Hall Paint || floorpi-chairs || 50 || 0
 
|-
 
|-
| Hall Snacks || Angela || 60 || 0
+
| [[GameComm|Game Comm]] || Michael || 50 || 0
 
|-
 
|-
| Hall Paint || floorpi-chairs || 50 || 20+?
+
| Flour, Sugar, Rice, etc. || floorpi-chairs || 50 || 0
 
|-
 
|-
| [[GameComm|Game Comm]] || Michael || 50 || 38
+
| Baking sheets, pots, pans, etc. || Angela & Rachel || 100 || soon
 
|-
 
|-
| Flour, Sugar, etc. || floorpi-chairs || 40 || 25
+
| Slush || floorpi-chairs || 150 || 0
 
|-
 
|-
| Garden || Angela || 20 || 25
+
| Rush || rush chairs (tbd) || 300 (cap) || Aug 2008
 
|-
 
|-
| Baking sheets, pans, etc. || Rachel || 20 || soon
+
| Bob || floorpi-chairs || 200 || 0
 
|-
 
|-
| Kitchen Supplies || floorpi-chairs || 15 || 18
+
| Switches || Adam || 60 || 0
|-
+
| Speaker || Angela || 15 || 20
+
|-
+
| Slush || floorpi-chairs || * || 10
+
 
|-
 
|-
 
|}
 
|}
  
*Slush is unknown. Why? Because the budget was done before all outstanding receipts were submitted and while there were outstanding checksWhat is slush used for? Primarily for when the hall unexpectedly needs to spend money to cover [[You|your ass]]. About how much? We really don't know, how about $100?
+
==Mural Policy==
 +
 
 +
A proposal should be emailed to the hall (& posted on location if possible) with
 +
a basic design and locationImportant factors: background color, general
 +
content, size, etc.
 +
 
 +
Painting can start after 12 hours after that objections can be raised for
 +
another 2 days (60 hours after original proposal).  If changes are made to the
 +
design/proposal all times restart, meaning: another 12 hours until painting and
 +
then 2 more for objections.
 +
 
 +
Threshold for objections is 10% (meaning essentially always 4 people).  You
 +
should include some reason for your objectionThen if proposer can make
 +
changes and as stated above times restart.
 +
 
 +
If painting has started and then objections occur (to previously mentioned
 +
thresholds), then the painter has one week to paint it a solid neutral color
 +
(ex: white, off white, institute white, light colors...)

Revision as of 23:57, 10 February 2008

Important Hall Administration Stuff

Party

Fall 2007: The Donner Party was on Saturday October 6. Proper execution (ha ha, "execution") was vital to the health of our enormous πnis.

Spring 2008: ???

FAC

The FAC was this Friday (10/19/07). The theme was Liquid Crack.

Budget

When applicable, email out exact specs of item a few days before actual purchase. Try to buy things that you can by March.

Item Sponsor Total $ $ Spent
Hall Feeds floorpi-chairs 180 to be scheduled
Finals Dinners floorpi-chairs 200 end of term
New Athena Michael/Adam 250 0
Party PartyComm 200 tba
Party Gadgets PartyComm 50 tba
Hall Parties PartyComm 150 tba
Hall Paint floorpi-chairs 50 0
Game Comm Michael 50 0
Flour, Sugar, Rice, etc. floorpi-chairs 50 0
Baking sheets, pots, pans, etc. Angela & Rachel 100 soon
Slush floorpi-chairs 150 0
Rush rush chairs (tbd) 300 (cap) Aug 2008
Bob floorpi-chairs 200 0
Switches Adam 60 0

Mural Policy

A proposal should be emailed to the hall (& posted on location if possible) with a basic design and location. Important factors: background color, general content, size, etc.

Painting can start after 12 hours after that objections can be raised for another 2 days (60 hours after original proposal). If changes are made to the design/proposal all times restart, meaning: another 12 hours until painting and then 2 more for objections.

Threshold for objections is 10% (meaning essentially always 4 people). You should include some reason for your objection. Then if proposer can make changes and as stated above times restart.

If painting has started and then objections occur (to previously mentioned thresholds), then the painter has one week to paint it a solid neutral color (ex: white, off white, institute white, light colors...)